Opis
The bike path and sidewalk in front of the Prison Point CSO facility has not been shoveled or salted and is an icy, rutted mess.
The bike path and sidewalk in front of the Prison Point CSO facility has not been shoveled or salted and is an icy, rutted mess.
5 Skomentujs
City of Cambridge (Verified Official)
Potwierdzone Public Works - RL (Operations) (Verified Official)
Zamknięte Public Works - RL (Operations) (Verified Official)
Ponownie otwarte TM (Zarejestrowany użytkownik)
I checked this morning and it was still just as bad -- which sidewalk did you check? This building has frontage on two streets, Education Circle and Industrial Park Road. The former is clear, the latter is the one I'm reporting.
Here's another photo for context. That large white expanse adjacent to the road is entirely snow-covered sidewalk, untouched by shovel or salt. The gray area is the bike path, mostly a sheet of ice and unsafe to ride on.
Please re-inspect this bike path and sidewalk. It's definitely not in compliance.
Zamknięte Public Works - RL (Operations) (Verified Official)